Projects
-

Petro Chemical
Petrochemical Facility Rigging
Project Description
PSC performed the rig-in and rig-out of a drainage belt system, including the installation of a new belt frame and motor. The work required precise coordination…
Learn More -

Bridge & Highway
Digital Display Sign Steel Installation
Project Description
The project involved installing structural steel and digital displays in three phases. Phase 1 included installing interior structural steel to support exterior…
Learn More -

Automotive
Tandem Line
Project Description
PSC was contracted to provide the turnkey installation of a tandem press line
Learn More -

Automotive
Automotive Process Unit Installation
Project Description
Installed multiple 40,000-lb process units on second-level platform. Involved offloading, inplant transport, and precise placement.
Learn More -

Manufacturing
Minteq System Reinforcement
Project Description
Installation of steel reinforcement for new Minteq system. Includes removing and reinstalling ten (10) 1-1/4” x 4’x8’ plates, rigging and welding large steel…
Learn More
- ← Previous
- 1
- 2 (current)
- 3
- Next →


