Petrochemical Facility Rigging

Project Overview:

PSC performed the rig-in and rig-out of a drainage belt system, including the installation of a new belt frame and motor. The work required precise coordination within a constrained area and integration with the OEM for belt vulcanization.

Key Challenges & Solutions:

  • Restricted Work Area: Used detailed pre-planning and rigging strategies.
  • Compressed Timeline: Maintained flexible schedule aligned with critical path items.
  • OEM Coordination: Integrated early material handling and OEM procedures.

Equipment Utilized:

  • 18-Ton Carry Deck Crane
  • Overhead Crane
  • Assorted Rigging Systems

 
 