Scope of Work:
Installation of steel reinforcement for new Minteq system. Includes removing and reinstalling ten (10) 1-1/4” x 4’x8’ plates, rigging and welding large steel members.
Key Challenges & Solutions:
- Short outage window: Dual shifts to maximize output.
- Heavy components: Overhead crane and skilled rigging.
- Efficient weld prep: Arc gouging for quick and clean removal.
Equipment Utilized:
- Overhead Crane
- Arc Gouging Tools
- MIG Welding Equipment