Project Overview:
The project involved installing structural steel and digital displays in three phases. Phase 1, included installing interior structural steel to support exterior frames for new digital displays. Phase 2, involved PSC installing the exterior steel frames, followed by Phase 3 where the client, with crane support from PSC, will mount the digital displays. Coordinating these phases required organizing the closure of 5th Street and scheduling an outage for the RTA’s overhead trolley lines throughout the week.
Scope of Work:
Installed steel frames and supported mounting of digital displays in 3 phases. Required street closures and coordination with RTA overhead lines.
Equipment Utilized:
- Hand tools
- Welders
- Aerial lifts
- 250-ton hydraulic crane